By: Nicole Buddie

Senate Bill 9 (SB 9) will change the way we afford homeownership in California. Starting January 1, 2022, homeowners can maximize their properties with an SB 9 lot split. All lot splits will require permits issued by a local agency to build up to 4 units on one single-family residence. The lot split will also end traditional single-family zoning in California.


California’s new housing and zoning law goes into effect as mortgages continue to form the highest portion of the nation’s debt. As of October 2021, the Midwest held the highest homeownership rate at 69%, with the lowest rate in the West at 60%.

With the lowest homeownership rates in California this last year, Governor Gavin Newsom passed the new housing development program to alleviate the housing crisis and create more affordable living. Senate Bill 9 expects to create new development opportunities for homeowners. It also seeks to develop new strategies to lower mortgage payments, add more living space, increase home value, and earn additional income.

1

Feasibility = Would my property qualify for a lot split?

2

Design = What would my lot split look like?

3

Cost = How much would a lot split cost?

4

Permits = What would the permit process look like?

5

Timeline = How long would it take to complete a lot split?

See if your property qualifies and find out what exactly you can build, including lot splits & ADUs.

Here are the five things you should consider before planning your lot split.

1. Feasibility = Will my property be eligible for a lot split?

The law states that any homeowner who plans to occupy their primary residence for the next three years may be eligible to submit floor plans for a lot split. There are essential property conditions to consider and review with a contractor before ordering the split. It will be vital to have your trusted contractor evaluate the ground level, floor area ratio, setbacks, and the existing utilities from the primary home.

Multitaskr helps determine the feasibility of the lot split with a feasibility report. The feasibility report is a property assessment that analyzes building records, past permits, and all structures built by previous or current homeowners. It's vital to get a feasibility report during the first stages of your project to determine your property's weaknesses and strengths. There must be sufficient space to successfully complete the requested lot split. At Multitaskr, we will ensure all facilities are up to code to avoid restrictions during your SB 9 project.

2. Design: What would my lot split look like?

Once the feasibility of your lot split has been determined, you'll advance into the design phase. Your design will need to assure that the smaller parcel is at least 1,200 sq ft in size.

When requesting a lot split, the minimum ratio requirement for the smaller parcel is 40% of the entire lot. Therefore, there are three variations. You can choose to split your lot into a 60/40, 50/50, or 45/55 split.

Parcel maps, also known as property maps, make up the build of your lot. These maps will be used to construct additional units on either parcel of your property and help determine utility connections and setbacks. Another critical factor that will play into what kind of split fits your property will be based on the way your home's front is positioned. All new units being constructed must face a public road. Your design will also consider that each of the parcels can not be smaller than 1,200 sq ft.

Select the parcel model that interests you. Parcel models vary, splitting the lot in half, partially, or simply improving or converting an existing space.

3. Cost: How much would a lot split cost?

The cost of a lot split can be estimated with the assistance of various factors: the size of the lot, the number of units being constructed, the size of each of the units being built, the tiers of the units being built, amenities, number of bedrooms, and bathrooms. A 300 sq ft ADU starts at 99k, and currently, the cost per square foot of a stand-alone accessory dwelling unit is priced at $330.00.


The material cost will also play a significant role in your final price. However, Multitaskr recently opened a warehouse where materials can be stored to help minimize project cost increases due to skyrocketing lumber, steel, and other essential material. There are also additional ways to save when building. Suppose you’re planning on using the accessory dwelling unit for rental purposes. In that case, you can select from our catalog vanities and amenities that are recommended for rental use.

Review the potential expenses involved in lot splitting and building an ADU, such as construction drawings, permit fees, site preparation, and utility connections.

4. Permits: What would the permit process look like?

Submitting an SB 9 project to a local agency can be complex and expensive if the plans do not align with the city’s construction code. With the help of the feasibility report, we’ll build out a design that follows all SB 9 guidelines to prevent delays during the revision process. Our partnerships with the City of San Diego, National City, and Chula Vista allow us to work closely with representatives from various local agencies. These partnerships have offered guidance in aligning floor plans with the new housing and zoning codes.


Senate Bill 9 is brand new to contractors, architects, realtors, and local agencies. We recommend submitting all your floor plans for approval with our in-house permit team. They become the point of contact for all your design modifications requested by local agencies.

Enter your property information to request building records and build out your SB 9 project. Once your floor plans are ready, process all permits with our in-house team.

5. Timeline: How long would it take to complete a lot split?

If you’re considering a lot split, you’ll most likely want one to two accessory dwelling units (ADUs) built. It takes approximately three to six months to construct an ADU. At times, city permit revision and issuance can delay the process from 30-90 days. With more than one accessory dwelling unit built on the property, the estimated timeline ranges from five to nine months.


The project’s duration will vary depending on the complexity. The number of units being built, the customization, utility accessibility, and lot adjustments direct the timeline.


Senate Bill 9 will not only affect the way we afford homeownership, but it will change the way we build. With new tools to create more living space, increase home value, and earn additional income, the American dream will become more accessible to all.


Want to learn more about SB 9? Read the latest about the new housing bill here.

Stay up to date with the latest status of your project and access your construction schedule directly from the homeowner dashboard.

See if your property qualifies and find out what exactly you can build, including lot splits & ADUs.

Multitaskr blogs

This might interest you

blog_multitaskr_the_real_cost_of_building_an_adu_in_california_thumb_a1_1_5x

The Real Cost of Building an ADU in California

Explore ADU construction costs, from permits to design fees, and uncover the true expenses of building your accessory dwelling unit.
Multitaskr - Home solutions blog

How To Build an ADU: The Definitive Guide

Unlock the potential of your property with our comprehensive ADU construction guide. Elevate its value and functionality while enjoying a new living space. Get started now!

ADU Permits in California: The 2024 Guide to Fast Approval

Discover the essential steps for hassle-free ADU permitting in California. Master the process and start building your dream ADU today.
Five steps to simplify your homeowner experience

Five Things You Must Consider Before You Lot Split With SB 9


Here’s What You Need To Know About The New California Bill


1

Feasibility

Would my property qualify for a lot split?

2

Design

What would my lot split look like?

3

Cost

How much would a lot split cost?

4

Permits

What would the permit process look like?

5

Timeline

How long would it take to complete a lot split?

Download Your SB 9 Fact Sheet Now

You’re almost done!

We sent you a link to your Build Now, Pay Never Guide via email.

(If you don’t find it in your main inbox, please check your spam folder)


Maximize your property value with SB 9


100% ADU

FINANCING

AVAILABLE

DEFERRED PAYMENTS FOR UP TO 18 MONTHS

Your ADU made simple!

X